Not keptWater · promised in 2017 for 2025
Molson Coors aimed to produce with 22% less water per hectolitre in its large breweries by 2025, compared with 2016.
Target largely missed: water consumption at the large breweries has fallen only 2.8% since 2016. The target of restoring 3.5 billion gallons of water was, however, exceeded (3.7 billion).
Checked by The company's report
Sources:
Molson Coors, environnement